少妇人妻偷人精品免费视频69_在线观看中文字幕av_国产专区在线第一_超清福利精品视频在线观看_日韩精品中文字幕第1页

×

News

Conch Chuangye Wuwei Haichuang Domestic Waste-to-energy Project Successfully Realizes the First Car of Waste into the Plant
Date:2021-12-07 From:海螺創(chuàng)業(yè)

        With the correct leadership of the company and the strong support of various departments, with the cooperation and cooperation of the construction unit, the supervision unit, the participating units and the brothers, all the staff of Conch Venture will work together, December 5, 2021 10 At 18 hours, the Wuwei Municipal Solid Waste Incineration Power Generation Project realized the smooth entry of the first vehicle of solid waste into the plant. Wuwei Urban Management Bureau, Shijian Town Government, all staff of Conch Venture Wuwei Haichuang and relevant persons in charge of the participating units of the Wuwei Project witnessed this moment.

825aefb77dd1bc08762ce7b18994d46.jpg

The first garbage truck entered the factory smoothly 

        At 10:18 in the morning, the domestic garbage truck of Wuwei City was accompanied by a rumbling of firecrackers, dressed in red silk and red flowers, under the command of the Wuwei Haichuang site staff, passing the logistics gate, floor scales, and trestle slowly. Drive into the unloading hall. With the call of "Conch Venture Wuwei Haichuang's First Garbage Start Unloading", the household garbage was smoothly discharged into the garbage pit.

1b04ffa253032227961f55530d3ca0b.jpg

Group photo 

        The Conch Chuangye Wuwei Haichuang project is equipped with 2×500 tons/day mechanical grate furnace domestic waste incinerators. The project is planned at one time and implemented in two phases. The first phase of the project has a processing scale of 500 tons/day, and it can process domestic waste after reaching production capacity18 10,000 tons/year.

3d29ccb92d37edcdd7eebc8db6ec8fe.jpg

Conch Chuangye Wuwei Haichuang Domestic Waste Incineration Power Generation Project (Aerial View) 

        Conch Chuangye Wuwei Haichuang’s first truck of garbage entered the plant smoothly, marking the end of the construction of the Wuwei municipal solid waste incineration power generation project, which is about to enter the trial production stage, and the project will enter the "countdown" for grid-connected power generation. Conch Entrepreneurship and Wuwei Haichuang all staff will continue their efforts and sprint with all their strength, starting from the ceremony of the first truck of garbage entering the factory, supervising the completion of the project, making solid preparations before trial production, and launching a sprint to the grid-connected power generation target within the year. Make more contributions to the harmless treatment of domestic garbage and the improvement of the living environment in Wuwei City!

西林县| 临潭县| 栾川县| 远安县| 中宁县| 长春市| 清水河县| 游戏| 读书| 临洮县| 兖州市| 仙桃市| 尤溪县| 榆中县| 镇安县| 普兰店市| 中宁县| 保德县| 南雄市| 志丹县| 喀喇沁旗| 汤原县| 招远市| 宜昌市| 南阳市| 通化县| 文化| 普格县| 阿克苏市| 沙田区| 方正县| 晋州市| 洛南县| 沙坪坝区| 黄冈市| 开鲁县| 永清县| 贞丰县| 宁城县| 阿合奇县| 格尔木市|